Stealth is an Intamin Rocket Coaster, sitting where the relocated Flying Fish and the old Model World once stood is Thorpe Parks icon ride, standing at an impressive 205ft it launches riders to a top speed of 80mph in under 2.0 seconds! Construction started in January 2005 and the ride opened on time in March 2006, follow all of Stealth's construction here!
Here are a selection of pictures of Stealth testing before its opening in March 2006.
Just a day after being topped off, today a Pull Through test was completed using one of the trains cars.
Work continues on the top hat, the final part is due to be lifted on 26th September 2005!
Only 3 days since our last update and a lot has happened. The second supports for the top hat are in place, hydraulics are being installed, and work has started on installing the first pieces of track on the top hat structure, lots more brake fins have been installed on the launch track and the camelback hill lastly the station has wooden cladding installed, this will be painted and themed over the closed season.
A large update showing the track is now being built at a rather fast rate, all the track shown in this update has been erected in the past 3 days.
The Station, Maintenance Shed and Winch House are now almost complete, track will be arriving on site any day now.
The old advertising banners have now been taken down showing off the new adverts which were recently put up comparing the height of stealth to other rides at Thorpe Park.
The frame for the station is going up quickly and is starting to take shape, track is expected to be arriving soon.
New adverts for Project Stealth are up comparing the rides height to other Thorpe park rides. The new adverts also correct the speed from 0-80mph in 4 seconds to 0-80mph in 2.5 seconds.
More groundwork is happening around the area, the hydraulic room foundations are looking almost complete.
Footers for the huge hydraulic are almost complete, work is continuing on the footers for the main ride and the station.
There has been much progress since the last update, most of the land has now been leveled out and the area has been covered in shingle.
Design, Images and System Copyright Phillip Caudell - Content Copyright Thorpe Park Mania
home | contact | the team| buy us a drink